YORK Model YS Rotary Screw Liquid Chillers Style D R134a

0 komentar
Introduction
York YS chillers are manufactured to the highest design and construction standards to ensure high performance, reliability and adaptability to all types of air conditioning installations.
The units are intended for cooling water or glycol solutions and are not suitable for purposes other than those specified in this manual.
This manual and the Control System Operating Instructions contain all the information required for correct installation and commissioning of the unit, together with operating and maintenance instructions.
The manuals should be read thoroughly before attempting to operate or service the unit.
All procedures detailed in the manuals, including installation, commissioning and maintenance tasks must only be performed by suitably trained and qualified personnel.
The manufacturer will not be liable for any injury or damage caused by incorrect installation, commissioning, operation or maintenance resulting from a failure to follow the procedures and instructions detailed in the manuals.


1 SUPPLIER INFORMATION
1.1 Introduction
1.2 Warranty
1.3 Safety
1.4 Responsibility for Safety
1.5 About this Manual
1.6 Misuse of Equipment
1.7 Safety Labels
1.8 Material Safety Data
2 Product Description
2.1 General
2.2 Capacity Control
2.3 Compressor
2.4 Compressor Lubrication System
2.4.1 Oil Pump
2.4.2 Oil Heater
2.5 Compress Motor
2.6 Graphic Control Centre
2.7 Heat Exchangers
2.7.1 Evaporator
2.7.2 Condenser
2.7.3 Water Boxes
2.8 Refrigerant Flow Control
2.9 Options and Accessories
2.9.1 Service Isolation Valves
2.9.2 Hot Gas Bypass
2.9.3 Solid State Starter
2.9.4 Variable Speed Drive
2.10 Nomenclature
2.11 Range of Models
3 TRANSPORTATION, RIGGING AND
STORAGE
3.1 General
3.2 Shipment
3.3 Inspection, Damage and Shortage
3.4 Rigging
4 INSTALLATION
4.1 Location
4.2 Motors
4.3 Foundation
4.4 Clearances
4.5 Rigging Unit to Final Location
4.6 Locating and Installing Isolator Pads
4.7 Installing Optional Spring Isolators
4.8 Piping Connections
4.9 Cooler and Condenser Water Piping
4.9.1 Condenser Water Circuit
4.10 Stop Valves
4.11 Flow Switches (Field Installed)
4.12 Drain and Vent Valves
4.13 Checking Piping Circuits and Venting Air
4.14 Refrigerant Relief Piping
4.15 Unit Piping
4.16 Control Panel Positioning
4.17 Control Wiring
4.18 Power Wiring
4.19 Units with Solid State Starter
or Variable Speed Drive
4.20 Thermal Insulation
4.21 Installation Check
5 COMMISSIONING
5.1 Preparation
6 OPERATION
6.1 Oil Heater Operation
6.2 Checking the Oil Level in the Oil Reservoir
6.3 Start-up Procedure
6.3.1 Pre-Starting
6.3.2 Start-up
6.4 Chiller Operation
6.4.1 Condenser Water Temperature Control
6.5 Operating Log Sheet
6.6 Maintenance and Service
6.6.1 Normal and Safety System Shutdowns
6.6.2 Safety Shutdowns
6.6.3 Cycling Shutdowns
6.7 Stopping the System
6.8 Prolonged Shutdown
6.9 Start-up after Prolonged Shutdown
7 MAINTENANCE
7.1 Inspections
7.1.1 Daily
7.1.2 Weekly
7.1.3 Every 3 Months
7.1.4 Every 6 Months (or more often as required)
7.1.5 Annually (more often if necessary)
7.2 Oil Return System
7.2.1 Changing the Dehydrator
7.3 Oil Charge
7.3.1 Oil Charging Procedure
7.4 Refrigerant Charge
7.4.1 Checking The Refrigerant Charge
7.4.2 Leak Testing
7.4.3 Vacuum Testing
7.4.4 Refrigerant Charging
7.5 Condenser and Cooler
7.5.1 Chemical Water Treatment
7.5.2 Tube Cleaning
7.5.3 Tube Cleaning Procedures
7.5.4 Tube Leaks
7.6 Compressor
7.7 Compressor Motor
7.7.1 Greased Bearings on Reliance Q5800 Motors
7.8 Electrical Controls
7.9 Testing Motor Winding Insulation
8 TROUBLE SHOOTING
9 TECHNICAL DATA
9.1 Dimensions
9.2 Weights
9.3 Compressor Dimensions
9.4 Motor Weights
9.5 Optional Solid State Starter Details
9.6 Process and Instrumentation Diagram
9.7 Water Box Nozzle Arrangements
10 SPARE PARTS
11 DE-COMMISSIONING, DISMANTLING AND
DISPOSAL
11.1 General
Please Download Here PDF | 2.01 MB
Read More ->>

Thursday, September 27, 2012

RCUE40AG2-400AG2 RHUE40AG2-240AG2 Service Manual

0 komentar
RCUE40AG2-400AG2
RHUE40AG2-240AG2
Cooling capacity 112 kW - 1030 kW
Cooling capacity 106 kW - 585 kW
Heating capacity 110 kW - 556 kW

Content
1. Product range and specifi cations
1.1. General data for RCUE40~400AG2
1.2. General data for RHUE40~240AG2
2. Test run
2.1. Check before test run
2.2. Test run method and check
2.3. Restart of Test Run
2.4. Instruction at delivery
2.5.Warning & Cautions
3 Electrical Wiring Diagram
3.1. Power Wiring Diagram
3.2. Power Wiring Diagram (FAN)
3.3. Control PCB (PCBc)
3.4. Input / Output PCB (PCBd)
3.5. Power Wiring Diagram (MCB Option)
3.6. Diagram abbreviations descriptions
4. Control system
4.1. List of Main Control Function
4.2. Water control
4.3. Compressor control
4.4. Current limit control
4.5. Reverse protection control
4.6. Restart control after power failure
4.7. Operation error/wrong setting prevention control [40 – 40]
4.8. Forced capacity control
4.9. Second water temperature setting
4.10. Heat storage operation by external order
4.11. Operation by DC24V input (Remote Control)
4.12. Installation of switch for snow measure (Fan manual operation)
4.13. Switch for confi rmation of high pressure cut
4.14 Antifreeze control in winter
4.15. Saving energy priority mode, silence priority mode (night shift), only cooling
4.16. Defrost (only air-cooled heat pump type)
4.17. Thermo off selection function
5. Troubleshooting
5.1. Initial check
5.2. Troubleshooting
5.3. Analysis and countermeasure of abnormal running
5.4. Thermistor characteristics
6. Maintenance
6.1. Maintenance criteria
6.2. Maintenance criteria of Screw Compressor
6.3. Maintenance of Water Quality
6.4. Cleaning of water side heat exchanger
6.5. Check items in daily operation
6.6. Caution on handling of R407C
6.7. Manual at compressor overall check and parts check
6.8. Refrigerant cycle diagrams
6.9. Overhaul work
6.10. Vacuuming Procedure
6.11. Additional refrigerant insertion
Please Download here, you must register before to download.
Read More ->>

Thursday, July 12, 2012

Installation Operation Maintenance Voyager

0 komentar
Installation Operation Maintenance Voyager™
Commercial 12.5 to 50 Ton 60 Hz Commercial 22.9 to 41.7 Ton 50 Hz CV or VAV Rooftop Air Conditioners with ReliaTel™ Controls

Model Number
"Y" and later Design Sequence
TC*, TE*, YC*330A, 360A, 420A, 480A, 600A (60 Hz/3 phase)
TC*, TE*, YC*275A, 305A, 350A, 400A, 500A (50 Hz/3 phase)


This booklet describes the proper installation, start-up, operation, and maintenance procedures
for TC_, TE_, and YC_27.5 to 50 Ton CV (Constant Volume) and VAV (Variable Air Volume)
applications. Refer to the table of contents for a listing specific topics. Refer to the "System
Troubleshooting" section at the end of this manual for troubleshooting information.
By carefully reviewing the information within this manual and following the instructions, the risk
of improper operation and/or component damage will be minimized.
It is important that periodic maintenance be performed to help assure trouble free operation. A
maintenance schedule is provided at the end of this manual. Should equipment failure occur,
contact a qualified service organization with qualified, experienced HVAC technicians to properly
diagnose and repair this equipment.

Table of Contents
Literature Change History
Overview of Manual
Model Number Description
60 Hz Description
50 Hz Description
General Information
Commonly Used Acronyms/Abbreviations
About the Unit
Precautionary Measures
First Aid Measures
Unit Inspection
Storage
Pre-Installation
General Unit Requirements
Downflow Models Only:
All Units:.
Electrical Requirements
Field Installed Control Wiring
Gas Heat Requirements
Unit Dimensions and Weights
Recommended Clearances
Roof Curb and Ductwork
Horizontal Ductwork
Unit Rigging and Placement.
Installation General Requirements
Condensate Drain Connection
O/A Sensor & Tubing Installation
Installation Electrical
Disconnect Switch External Handle
Factory Mounted Option)
Main Power Wiring
Thru-the-Base Electrical
(Optional Accessory)
Electrical Wire Sizing and Protection Device Equations
Low Voltage Wiring
Control Power Transformer
Field Installed AC Control Wiring
Field Installed DC Control Wiring
Remote Panels and Sensors
Constant Volume Control Options
Variable Air Volume Control Options
Installation Piping
Connecting the Gas Supply Line to the Furnace Gas Train
Start-Up
Unit Control Modules
System Operation
Microelectronic Control Features
Variable Air Volume Applications
Constant Volume or Variable Air Volume Applications
 Preparing the Unit for Operation
Electrical Phasing
Voltage Supply and Voltage Imbalance
Starting the Unit
Test Modes
Verifying Proper Fan Rotation
Verifying Proper Air Flow (CFM)
Exhaust Fan Operation
Economizer Damper Adjustment
Economizer (O/A) Dampers
Manual Fresh Air Damper
Starting the Compressor
Starting 27.5 - 35 Ton units
Starting 40 to 50 Ton units
Compressor Oil
Scroll Compressor Operational Noises
At Low Ambient Start-Up
During Normal Operation
Compressor Crankcase Heaters
Charging by Subcooling
Measuring Subcooling
Gas Heat Units
Electric Heat Units
Final Unit Checkout
For Constant Volume Units;
For Variable Air Volume Units;
Sequence of Operation
Mechanical Cooling Sequence Of Operation
Units without an Economizer
Economizer operation based on Dry Bulb
Economizer operation based on Reference Enthalpy
Economizer Operation based on Comparative Enthalpy
Gas Heat Sequence Of Operation
Electric Heat Sequence Of Operation
Maintenance
Fan Belt Adjustment
Monthly Maintenance
Filters
Cooling Season
Heating Season
Coil Cleaning
Refrigerant Coils
Diagnostics
System Status/Diagnostics
Terminal locations
Diagnostics (CV units only)
Diagnostics (VAV only)
Resetting Cooling and Ignition Lockouts
Zone Temperature Sensor (ZSM) Service Indicator
RTRM Zone Sensor Module (ZSM) Test
Test 1
Test 2
Test 3
Test 4
Programmable & Digital Zone Sensor Test
Rooftop Refrigerator Module (RTRM)
Test 1
Test 2
ReliaTel Air Module (RTAM) Test
Test 1
Test 2
Test 3
Test 5
VFD Programming Parameters
Unit Wiring Diagram Numbers
Warranty and Liability Clause
COMMERCIAL EQUIPMENT RATED 20 TONS AND LARGER AND RELATED ACCESSORIES
Please Download Here
.
Read More ->>

CVHE, CVHF, CVHG Water-Cooled CenTraVac Chillers

0 komentar
Installation, Operation, and Maintenance Guide
CVHE, CVHF, CVHG Water-Cooled CenTraVac™ Chillers
With Tracer AdaptiView™ Control

The unit nameplate is located on the left side of the control panel. A typical unit nameplate is illustrated below and contains the following information.
• Unit model and size descriptor
• Unit electrical requirements
• Correct operating charge and refrigerant type
• Unit test pressures and maximum operating pressures
• Unit literature
Serial Number - The unit serial number provides the specific chiller identity. Always provide this serial number when calling for service or during parts identification.
Service Model Number - The service model represents the unit as built for service purposes. It identifies the selections of variable unit features required when ordering replacements parts or requesting service.
Note: Unit-mounted starters are identified by a separate number found on the starter.
Product Description Block - The CenTraVac models are defined and built using the Product Definition and Selection (PDS) system. This system describes the product offerings using a product coding block which is made up of feature categories and codes that identifies all characteristics of a unit.

Table of Contents
Copyright
Trademarks
Warnings and Cautions
Model Number Description
Pre-Installation
ASHRAE Standard 15 Compliance
Unit Shipment
Installation requirements and Contractor responsibilities
Storage Requirements for chillers not yet installed
Unit Components
Unit Dimensions and Weights
Recommended Unit Clearances
Installation Mechanical
Operating Environment
Foundation Requirements
Rigging
Unit Isolation
Isolation Pads
Spring Isolators
Unit Leveling
Installation Water Piping
Overview
Water Treatment
Pressure Gauges
Valves
Strainers
Flow-Sensing Devices
Evaporator and Condenser Water Piping
Water Box Locations
Water Piping Connections
Grooved Pipe Coupling
Flange-Connection Adapters
Victaulic Gasket Installation
Bolt-Tightening Sequence for Water Piping Connections
Pressure Testing Waterside Piping
Purge Piping
EarthWise Purge Requirements - Purge Installation
Vent Piping
Refrigerant Vent-Line
Vent-line Installation
Insulation
Unit Insulation Requirements
Insulation Thickness Requirements
Installation Controls
Specifications
Installing the AdaptiView display
Adjusting the AdaptiView display arm
Electrical information
Installation Requirements
Electrical Requirements
Trane supplied starter wiring
Customer supplied remote starter wiring
Current transformer and Potential transformer wire sizing
Power Supply Wiring
Circuit Breakers and Fused Disconnects
Power Factor Correction Capacitors (optional)
Interconnecting Wiring
Starter to Motor Wiring (Remote-Mounted Starters Only)
Starter to control panel wiring
10kv-13.8kv Medium Voltage Installation
Motor Supply Wiring
System Control Circuit Wiring
Temperature Sensor Circuits
Unit Start-Up
Starter Module Configuration
Schematic Wiring Drawings
Operating Principles
General Requirements
Cooling Cycle
Oil and Refrigerant Pump
Motor Cooling System
AdaptiView Display
Tracer TU Chiller Service Tool
Start-up and Shut Down
Sequence Of Operation
Ice Machine Control
Free Cooling Cycle
Hot Gas Bypass
Hot Water control
Heat Recovery Cycle
Auxiliary Condensers
Control Panel Devices and Unit Mounted Devices
Unit Start-Up and Shut-down Procedures
Maintenance
Compressor Oil Change
Oil Change Procedure
Oil Filter
General Lubrication
Cleaning the Evaporator
Purge System
Long Term Unit Storage
Refrigerant Charge
Waterbox Removal and Installation
Discussion
Procedure
Connection Devices Information
Forms
Please Download Here
Read More ->>

Operation Maintenance Water Cooled CenTraVac With CH530

0 komentar
Warnings and Cautions
Notice that warnings and cautions appear at appropriate intervals throughout this manual. Warnings are provided to alert installing contractors to potential hazards that could result in personal injury or death, while cautions are designed to alert personnel to conditions that could result in equipment damage.
Your personal safety and the proper operation of this machine depend upon the strict observance of these precautions.

Contents
Warnings and Cautions
General Information
Unit Control Panel (UCP)
Operator Interface
Chilled Water Setpoint
Inter Processor Communication (IPC)
Control System Components
Controls Sequence of Operation
Machine Protection and Adaptive Control
Unit Startup
Unit Shutdown
Periodic Maintenance
Oil Maintenance
Maintenance
Forms
Please Download Here
Read More ->>

Wednesday, July 11, 2012

200-Series MicroTech Control Panel Operating Manual

0 komentar
Operating Manual
200-Series MicroTech Control Panel
For Centrifugal Chillers


Table of Contents
Introduction
General Description
General Description
Control Panel Layout
Component Description
Keypad/Display Operation
Menu Structure
MicroTech Status Menus
Control Menu Description
Alarm Menus Description
Master/Slave Setup
Alarms
Download Here
Read More ->>

Control Panel McQuay

0 komentar
Control Panel
Air-Cooled Screw Chillers
AWS
50 Hertz
R-134a


Table of Contents
INTRODUCTION
OPERATING LIMITS
CONTROLLER FEATURES
GENERAL DESCRIPTION
CONTROL PANEL LAYOUT
POWER PANEL LAYOUT
ECONOMIZER COMPONENTS
CONTROLLER DESCRIPTION
HARDWARE STRUCTURE
SYSTEM ARCHITECTURE
SEQUENCE OF OPERATION
CONTROLLER OPERATION
MICROTECH III INPUTS/OUTPUTS
EXTENSION I/O COMPRESSOR #1 TO #3
I/O EXV CIRCUIT #1 TO #3
EXTENSION I/O FAN MODULE CIRCUIT #1 & 2
EXTENSION I/O FAN MODULE CIRCUIT #3
EXTENSION I/O UNIT ALARM & LIMITING (POL)
SETPOINTS
UNIT FUNCTIONS
CALCULATIONS
UNIT ENABLE
UNIT MODE SELECTION
UNIT CONTROL STATES
UNIT STATUS
ICE MODE START DELAY
EVAPORATOR PUMP CONTROL
NOISE REDUCTION
LEAVING WATER TEMPERATURE (LWT) RESET
UNIT CAPACITY CONTROL
UNIT CAPACITY OVERRIDES
CIRCUIT FUNCTIONS
CALCULATIONS
CIRCUIT CONTROL LOGIC
CIRCUIT STATUS
COMPRESSOR CONTROL
CONDENSER FAN CONTROL
EXV CONTROL
ECONOMIZER CONTROL
LIQUID INJECTION
ALARMS AND EVENTS
SIGNALING ALARMS
CLEARING ALARMS
DESCRIPTION OF ALARMS
UNIT EVENTS
CIRCUIT STOP ALARMS
CIRCUIT EVENTS
ALARM LOGGING
USING THE CONTROLLER
NAVIGATING
OPTIONAL REMOTE USER INTERFACE
START-UP AND SHUTDOWN
TEMPORARY SHUTDOWN
EXTENDED (SEASONAL) SHUTDOWN
FIELD WIRING DIAGRAM
SYSTEM MAINTENANCE
PREVENTATIVE MAINTENANCE SCHEDULE
APPENDIX
DEFINITIONS